<
>

 

Santani River 2th Bridge


                                                                 Bridge name: Santani River 2th Bridge

                                                                 Total length: 152m

                                                                 PMU: West Nippon Expressway Co., LTD.

                                                                 Contractor: Kawada Construction Co., LTD.

                                                                                   Tobishima Corporation

                                                                 Location: Tokushima, Japan

                                                                 Cable system: APS (ATC Method)

                                                                 Anchorage ASM19S15.2

                                                                 Construction period: 1997~2000

01.jpg02.jpg

 

    


Anderson Technology Corporation Copyright